๐Ÿ“ž 0800 112 0255
KH Glass LogoKH Glass
Kingfield apartment development, Birmingham B12

Case Study ยท Kready Construction

Kingfield, Birmingham B12
237 Apartments, Consistent Delivery

One supplier, one standard, start to finish. We manufactured and installed 237 identical bathroom mirrors for Kready Construction.

Project Snapshot

Client

Kready Construction

Location

Birmingham B12

Scope

Supply and installation of 237 bathroom mirrors

Specification

6mm bevelled and polished, all same size

Completion

Q4 2023

The Challenge

Large developments don't just test your product. They test your systems.

Large-scale residential developments test your team and your ability to keep delivering the same standard across hundreds of units without shortcuts. We delivered exactly that.

Kingfield is a 237-apartment residential development. Every apartment needed an identical bathroom mirror โ€” 6mm bevelled and polished, same size throughout. For a project of this scale, consistency isn't optional. It's the difference between a professional delivery and a patchwork job. One supplier, one standard, start to finish.

Kingfield apartments viewed along the street, Birmingham B12

Our Approach

In-house, from first cut to final fix.

In-house manufacturing

We manufactured all 237 mirrors in our own Birmingham facility. No third-party fabricators. No handing off to another supplier mid-project.

  • Precise CNC cutting and bevelling on every unit
  • Consistent quality control at each stage
  • The ability to adjust if site conditions change

Our own installation team

We didn't just supply the mirrors โ€” we installed them. Our team managed delivery scheduling, coordinated with Kready's main build programme, and ensured consistent workmanship across all 237 apartments.

One team. One point of accountability. Start to finish.

Completed Kingfield apartment bathroom with fitted mirror

What We Delivered

237 apartments. One standard.

  • โœ“237 mirrors โ€” All to the same specification.
  • โœ“Consistent finish โ€” 6mm bevelled and polished throughout.
  • โœ“On-time delivery โ€” Coordinated with the build schedule.
  • โœ“Zero defects โ€” In manufacturing and installation.
  • โœ“Seamless coordination โ€” With Kready Construction's main programme.
Kready Construction project manager and site team overlooking the Kingfield site

Why This Matters

A reliable partner, not an order-taker.

When you're managing a 237-apartment development, you need suppliers who understand scale. Not just the volume, but the discipline it takes to deliver the same standard across every single unit.

We've been doing this since 1976 โ€” for contractors, developers, and architects who need glass solutions they can depend on. Kingfield is proof of that commitment.

Project Gallery

Kingfield in pictures

Kingfield apartment building, Birmingham B12 โ€” red brick residential development
Kingfield, Birmingham B12 โ€” 237 apartments
Kingfield apartments viewed along the street, Birmingham B12
The development from the street
View between the new Kingfield apartments and neighbouring buildings
The development and its surroundings
Completed Kingfield apartment bathroom with fitted mirror
A completed apartment bathroom
Kready Construction project manager and site team overlooking the Kingfield site
On site with the Kready Construction team

Ready to Discuss Your Project?

If you're planning a residential or commercial programme that depends on consistent, reliable glazing delivery, we'd welcome the conversation early. We're a better partner when we understand your project from the start.

Birmingham 0121 400 0455 ยท Manchester 0161 738 1455 ยท Leicester 0116 409 1255